Antelec is an internationally renowned electrical contracting company & is strategically poised to enter MEP Contracting with the capability to offer end to end comprehensive solution to the clients providing Electrical, HVAC, Plumbing and Fire Fighting. Antelec is known for Quality, Safety, Reliability and Timely Delivery of projects undertaken.
Urgent need for Battery charger for Container Port Terminal with compliance to sea shore salty environment &IEC Standards for HT panel
Customer was running against time to start the project at Mumbai container Port terminal in 3-4 weeks. Their earlier vendors were unable to deliver the Battery chargers on time
Antelec’s challenge was to meet all the requirements in one go and find a suitable vendor who could meet the Quality standards and Delivery challenges
The customer expressed satisfaction with the fast delivery of materials and the timely completion of all tasks.
Suyash Speciality Engineering, established in 2012, is located at Pune, Maharashtra, India. The company specializes in manufacturing and supplying machine parts, lifter parts, and hydraulic cylinders. It has become a prominent supplier in its field.
The EPC contractor urgently needed to complete the project for the chemical industry. Product compliance with technical requirements was a must. 110 VDC, 75 Ampere FC, and 80 Ampere FCBC Charger (Dual Charger).
Approval from the consultants needed to be obtained to ensure that the product was ready within 3 to 4 weeks. Additionally, there was limited time to arrange the materials, adding significant pressure to the process.
What steps must be taken to arrange the materials as required to begin production while ensuring that technical compliances and manufacturing standards are adhered to?
ESBEE Power Solutions Pvt. Ltd. has been a leader in co-generation power plants and top-quality boiler manufacturing for over 16 years. Recognized as a leading manufacturer of power plant equipment, heat exchangers, and pollution control systems, ESBEE consistently designs, manufactures, and delivers co-generation power plants and boilers that surpass industry standards.
The EPC contractor urgently needed to complete the project for the sugar and cogeneration industry. Product with compliance with Technical requirements was a must. FC-FCBC 110V-40-80A battery chargers #4 with 2V-100Ah to 200Ah VRLA SMF batteries
Approval from the consultants needed to be obtained to ensure that the product was ready within 5 to 6 weeks. Additionally, there was limited time to arrange the materials, adding significant pressure to the process.
What steps must be taken to arrange the materials as required to begin production while ensuring that technical compliances and manufacturing standards are adhered to?